Hotel (Leeds City Centre)

A few words about the project

The popular hotel in the centre of Leeds consistently enjoy an 85% occupancy level and decided to freshen up their look with a brand new refurbishment. The hotel is in the area of the Leeds Arena and serves the venue continually therefore speed of refurbishment was paramount. The northern based contractors really turned performed to the time frame round and the project completed when it had to. 

The tiles used on this project from Bedrock Tiles were out of the Metals, Hardcore, Florence, Flash  and Cement.

Date: 10 January 2019

Client: Hotel (Leeds City Centre)

Category: Hospitality, Leisure & Retail